EICR Verification

Overdue unsatisfactory EICR recorded against this property

This notice has been issued after an unsatisfactory Electrical Installation Condition Report was registered. The 28-day remedial window has passed and the compliance case remains open.

Overdue — action required immediately
Important

Remedial works should be completed within 28 days of the EICR report date, or sooner where specified by the inspecting contractor.


Remedial action overdue

This property received an unsatisfactory outcome in an Electrical Installation Condition Report. Evidence of remedial completion or a new satisfactory EICR may be required to close the case.

Overdue compliance warning

The remedial action deadline has passed.

Action deadline: 07/07/2026

TESC reference
005852CB16CG
Property address
16 Crescent Grove
Postcode
SW4 7AH
Date of inspection
09/06/2026
Valid until
30/11/-0001
Remedial deadline
07/07/2026
EICR reference
005852CB16CG
Contractor
BIM Electrical Group LTD
Contractor phone
0800 008 6548
Contractor email
info@bimelectricalgroup.com
Property rented
YES
Designated HRRB
NO
Tenants in occupation
YES
Status
unsatisfactory
EICR observations recorded
  • Lack of RCD protection for all circuits
  • High ZS readings obtained on lighting circuit
  • Low IR readings obtained on lighting circuit
Associated EICR image 1
Filed EICR document

This record includes a filed EICR document.

View filed EICR PDF
Verification notice

This page confirms that an EICR record exists in the TESC register for the property and reference shown above. The record should be checked against the original issued certificate where required.

Next steps to close this case

To demonstrate compliance and close the TESC case for this property, one of the following routes should be completed.

Option 1: Use the original contractor

  • The original contractor completes the remedial works.
  • A new satisfactory EICR is issued for the property.
  • The updated certificate is supplied directly to TESC.

Option 2: Use a different contractor

  • Appoint a qualified electrician to carry out the remedial works.
  • Ensure all works are completed to BS 7671 standards.
  • Obtain a new satisfactory EICR once works are complete.
  • Submit the new certificate and contractor details to TESC.

A £24.99 TESC case-handling fee applies where a different contractor is used.

Close your overdue TESC case online

If you are using a contractor other than BIM Electrical Group LTD, you must notify TESC and upload your new satisfactory EICR so this case can be marked as compliant.

A £24.99 TESC case-handling fee is payable as part of this process.